Stargate: every OpenAI data center site and where it stands

Stargate is OpenAI's program to build its own AI computing capacity with partners including Oracle, SoftBank, Crusoe and Vantage. It was announced in January 2025 as a $500 billion, four-year plan starting in Texas, and on April 29, 2026 OpenAI said it had passed its 10 GW goal in the US. This tracker lists every announced site with its partners, capacity and status as the companies themselves have stated them.

Published November 20, 2026. Capacities are as announced; where a company has not published one, we say so.

Stargate sites in the US

SiteLocationPartnersAnnounced capacityStatus
Abilene (flagship)Abilene, TXOracle, CrusoeAbout 1.2 GW, 8 buildings2 buildings operating, 6 under construction; NVIDIA GB200
FrontierShackelford County, TXOracle, Vantage1.4 GW, 10 buildingsUnder construction; first building due H2 2026
Milam CountyMilam County, TXSB Energy (SoftBank)1.2 GWUnder construction
Project JupiterDoña Ana County, NMOracle, STACK InfrastructureNot published (4 buildings)Early construction
LordstownLordstown, OHSoftBankNot published per siteAnnounced September 2025
The BarnSaline Township, MIOracle, Related DigitalAbout 1 GWGroundbreaking June 1, 2026
LighthousePort Washington, WIOracle, Vantage902 MW critical IT (Vantage)Planned; completion 2028

OpenAI also counts capacity from CoreWeave toward Stargate, at sites it has not listed.

Stargate outside the US

ProgramLocationPartnersAnnounced capacityStatus
Stargate UAEAbu DhabiG42, Oracle, NVIDIA, Cisco, SoftBank1 GW cluster; first 200 MW in 2026Under construction
Stargate NorwayNarvikNscale, Aker230 MW initially, 290 MW more planned100,000 NVIDIA GPUs targeted by end of 2026
Stargate UKSeveral UK sitesNscale, NVIDIANot published in MW; up to 8,000 GPUs in Q1 2026Announced
IndiaNot publishedTata Group (TCS HyperVault)100 MW, scalable to 1 GWIn development
KoreaNot publishedSamsung, SKNot publishedMemoranda of understanding
ArgentinaNot publishedSur EnergyNot publishedLetter of intent

How the program grew

DateWhat OpenAI announced
January 21, 2025$500 billion over four years, $100 billion immediately; build-out starts in Texas
July 22, 20254.5 GW added with Oracle; more than 5 GW under development
September 23, 2025Five new sites; nearly 7 GW planned and more than $400 billion over three years
October 30, 2025Michigan added; more than 8 GW planned and more than $450 billion over three years
April 29, 202610 GW US goal passed, with more than 3 GW added in the previous 90 days

Why Texas leads

Three of the seven US sites, and the first one built, are in Texas. Land, gas and wind power and the ERCOT market made the state the fastest place to put gigawatts of load on the grid, although ERCOT paused new connections of large data centers in August 2026 while the state audits its queue. See every Texas campus in our Texas data centers guide.

The power, cooling and construction companies behind these sites meet at Intelligence Disrupt 2027 in Dallas, March 22–24.

Questions

What is the Stargate project?
OpenAI's program to build AI data centers with partners. It was announced on January 21, 2025 with $500 billion over four years and equity from SoftBank, OpenAI, Oracle and MGX, with the build-out starting in Texas.
Where is Stargate being built?
In the US: Abilene, Shackelford County and Milam County in Texas, Doña Ana County in New Mexico, Lordstown in Ohio, Saline Township in Michigan and Port Washington in Wisconsin. Outside the US: Abu Dhabi, Narvik in Norway, the UK and India, with early agreements in Korea and Argentina.
How big is Stargate?
OpenAI said on April 29, 2026 that it had passed its 10 GW US goal, adding more than 3 GW in the previous 90 days. The single largest announced sites are Vantage's Frontier campus in Shackelford County (1.4 GW) and Abilene and Milam County (about 1.2 GW each).
Is the Abilene Stargate site running?
Partly. Crusoe reported in June 2026 that two of its eight buildings were operating and six were under construction, with NVIDIA GB200 systems. A planned 600 MW expansion was reported dropped in March 2026.
Who builds Stargate data centers?
Different partners at each site: Crusoe and Oracle in Abilene, Vantage in Shackelford County and Wisconsin, SB Energy (SoftBank) in Milam County, STACK in New Mexico, Related Digital in Michigan, G42 in Abu Dhabi, Nscale in Norway and the UK, and Tata in India.
How much does Stargate cost?
The headline figure is $500 billion. In September 2025 OpenAI said it expected more than $400 billion over the next three years, raised to more than $450 billion in October 2025. It has not published a figure since.

More guides

Sources

  1. OpenAI, Announcing the Stargate project · 2025-01-21
  2. OpenAI, Stargate advances with Oracle · 2025-07-22
  3. OpenAI, Five new Stargate sites · 2025-09-23
  4. OpenAI, Expanding Stargate to Michigan · 2025-10-30
  5. OpenAI, Stargate and SB Energy · 2026-01-09
  6. OpenAI, Building the compute infrastructure for the intelligence age · 2026-04-29
  7. OpenAI, Stargate Michigan groundbreaking · 2026-06-01
  8. Crusoe, contracted capacity approaches 5 GW · 2026-06-09
  9. Vantage Data Centers, Frontier campus · 2025-08-19
  10. Oracle and OpenAI data center fact sheet · 2025-09-22
  11. Vantage, Port Washington campus · 2026-11
  12. OpenAI, Introducing Stargate UAE · 2025-05-22
  13. OpenAI, Introducing Stargate Norway · 2025-07
  14. OpenAI, Introducing Stargate UK · 2025-09-16
  15. OpenAI, OpenAI for India · 2026-02-18
  16. OpenAI, Samsung and SK join Stargate · 2025-10-01
  17. OpenAI, Argentina's AI opportunity · 2025-10-14