Intelligence DisruptMining Disrupt Buy ticketsTickets

The AI infrastructure and data center conference and expo, 2027

Most AI events are about models and software. Intelligence Disrupt is about what they run on: energized megawatts, sites, cooling, GPUs, networks and the capital that builds them.

It runs March 22–24, 2027 at the Irving Convention Center at Las Colinas in Dallas, on one floor with Mining Disrupt, the Bitcoin mining expo whose operators already own much of the power AI is looking for.

Access Levels

Three passes. Capped seats for the AI and HPC deal-makers.

Elite and VIP are capped. Once they sell out, only General remains.

Your ticket also includes Mining Disrupt. Your selected pass benefits apply.

Maximum access

Elite Pass

$1,999Everything in VIP, plus:
  • Elite lounge and premium open bar
  • Backstage and speaker access
  • Founders dinner
  • BitAxe miner, while they last
No barriers. The room behind the room.Get Elite
Sells out first

VIP Pass

$999Everything in General, plus:
  • VIP lounge
  • Open bar
Where conversations turn into deals.Get VIP
Floor access

General Pass

$199
  • Keynotes and the expo
  • Opening and after party
  • Container showcase
  • Movie screening
  • Breakfast buffet
Get in the room.Get General
Pay in Bitcoin or USDTCard · PayPalInstant e-ticketCodes honored

Who it is for

  • AI clouds, GPU operators and model companies that need capacity
  • Data center developers, builders and EPC firms
  • Power producers, utilities, energy traders and owners of energized sites
  • Cooling, chip, network and hardware companies
  • Investors, lenders and insurers financing AI infrastructure

What is on the agenda

  • Power & grid: Power, now
  • Energized land: Shovel-ready sites
  • Project finance: Funded AI campuses
  • Builders & EPC: Data centers on deadline
  • Liquid cooling: Cooling for hot GPU racks
  • Stranded energy: Compute that goes to the power
  • Logistics: Modular AI pods
  • Insurance & risk: Cover for GPU fleets

Why it is different

Intelligence Disrupt shares its floor with Mining Disrupt. Bitcoin miners run some of the largest energized, interconnected and cooled sites in the world, and many are converting capacity to AI and HPC. Here the buyers and the owners of that capacity meet in one room.

Key facts

Dates
March 22–24, 2027
Venue
Irving Convention Center at Las Colinas, 500 W Las Colinas Blvd, Irving, TX 75039
Passes
General Pass $199, VIP Pass $999, Elite Pass $1,999
Exhibit
200 booths and sponsorships from $2,500

Intelligence Disrupt 2027 tickets and passesExhibit at Intelligence Disrupt 2027Speak at Intelligence Disrupt 2027Intelligence Disrupt 2027 agendaIntelligence Disrupt 2027 FAQ

On the expo floor

  • GPU clouds and AI compute providers
  • Data center developers, builders and colocation operators
  • Power producers, utilities and owners of energized sites
  • Liquid, immersion and air cooling suppliers
  • Chips, servers, networking and racks
  • Finance, insurance and site-selection firms

Data center topics

  • Power procurement, interconnection and behind-the-meter supply
  • Site selection and conversion of existing energized sites
  • Cooling for high-density AI racks
  • Construction, timelines and supply chains
  • Financing, leasing and insuring AI capacity

Why Texas

Texas has power, land and a large share of the US data center build-out, and the Dallas area is one of the country's largest data center markets. Read the AI data center guide for the power, cooling and site questions behind it.

Questions

What is an AI infrastructure conference?
A conference about what AI runs on rather than the models: power, data center sites, cooling, GPUs, networks and the capital that builds them. Intelligence Disrupt is built around that physical layer.
When and where is it?
Intelligence Disrupt 2027 runs March 22–24, 2027 at the Irving Convention Center at Las Colinas, 500 W Las Colinas Blvd, Irving, TX 75039, in Dallas, Texas.
Who exhibits?
GPU clouds, chipmakers, data center builders, cooling and power companies, and the operators who own energized megawatts and sites.
Does my pass include Mining Disrupt?
Yes. Intelligence Disrupt and Mining Disrupt share one floor, and every pass includes both events.
Is there an AI data center conference in 2027?
Yes. Intelligence Disrupt 2027 runs March 22–24, 2027 at the Irving Convention Center at Las Colinas in Dallas, one of the largest data center markets in the US.
What data center topics are covered?
Power and grid connections, shovel-ready sites, cooling for high-density GPU racks, HPC capacity, construction timelines and financing.
What will I see on the AI expo floor?
Booths from GPU clouds, chipmakers, data center builders, cooling and power companies, alongside the operators who control energized sites and the capital that finances them.

Conference, expo or trade show?

All three in one place. Exhibitors and buyers should read the data center expo and trade show page; power companies, the power conference page.

The power is on this floor. Be in the room.

March 22–24, 2027 · Irving Convention Center · Dallas

Intelligence Disrupt 2027Dallas · Mar 22–24Passes from $199Get tickets